Stage 4c. Schedule of Finishes (Optional)


This service provides the bridge between the technical construction drawings and the detailed aesthetic choices, giving you clarity and control over your material choices.

 

Our outline Schedule of Finishes covers:

  • Measured Finishes and Materials: A clear, room-by-room breakdown detailing what is required and the estimated quantity (m2, m, or unit count) of fixed materials for your project.
  • Accurate Cost Allowances: Setting a realistic financial scope by providing recommended budget allowances (e.g., £/m2) for key materials like flooring, tiles, and worktops, ensuring contractors price consistently.
  • Guidance on Fixed Fittings: Providing initial guidance on the suitability and type of key fittings, including showers, taps, kitchen sinks, appliances, and essential bathroom furniture (final choices by client).
  • Partial Specification: Detailing the type, finish, and quality of specific building elements, including external finishes, plastering, and any necessary works to the existing house.
  • Accurate Contractor Pricing: Offering the measurable information contractors need to provide accurate, fixed-price tenders, helping you avoid unexpected costs during the build.
  • Streamlined Decision Framework: Creating a clear structure that focuses your decision-making, allowing you to confirm final colour, shade, and pattern choices efficiently.
  • Editable Client Record: Providing an editable document that serves as your centralised record for all material decisions, sources, prices, and quantities, ready to be shared directly with your contractor.
  • Pragmatic On-Site Reference: Acting as a comprehensive on-site record for your builder, minimising questions and preventing delays related to material choice during the construction phase.

Included in Optional Stage 4c:

  • Room by Room Breakdown of Measured Finishes and Materials: detailing what is required and the estimated area.
  • Pragmatic Advice & Guidance on Fixed Fittings: Providing guidance and suitable options for key fittings.
  • Editable Client Record: Providing an editable document that serves as your centralised record for all material decisions.

 

 

Overall Project Timeline:

Stage 0-1 > Stage 2-3 > Stage 3b > Stage 4a > Stage 4b > Stage 4c > Stage 4d > Stage 5a

 

 

Previous Detailed Design & Construction Drawings Stage 4b:

Next Full Interior Design – Stage 4d:

Drawing Board and Instagram Feed


Always lovely to see spring is on the way during a survey visit this week.

 This lovely Cotswold stone cottage, south of Bath, is getting an update, replacing an ageing conservatory with a modern rear dining extension. 

The brief: maximum glazing and a standing seam metal roof to sit beautifully against the stone. Exciting things ahead.

13 1
I'm pleased to share that I've won Best of Houzz Service for 2026—my fifth time receiving this award since 2021.

This recognition comes from client reviews, and I'm grateful to everyone who's taken the time to share their experience. 

Listening to clients, responding to the house and its context, and designing to the brief—when you get these fundamentals right, it shows in the results and in client satisfaction.

Thank you to everyone who's worked with me over the past year. Here's to another year of thoughtful extension and renovation projects across Bath, Bristol, and Wiltshire.

#residentialarchitecture #extensiondesign #batharchitect #bristolarchitecture #wiltshirearchitect #homerenovation #architectureaward #houzzaward #bestofhouzz #ukarchitect #extensionideas #houseextension

4 0