Menu

Stage 4b. Detailed Design & Technical/Construction Drawings


In tandem with Stage 4a, construction details are prepared; these illustrate how important or non-standard details are to be built.

These drawings are concerned with aesthetic, finishing and unusual details such as the roof edges, box gutters, timber cladding, green roofs, large dormers, timber structures, special window details and thresholds.

This also includes other additional drawings – window and doors schedule, indicative electrical layout, kitchen layout and any other drawings needed to smooth work on site.

 

If the design includes any elements that are other than absolutely standard (or the contractor is unfamiliar with the materials or technique), these additional drawings help the contractor build on site easily and ensure a higher level of quality and crisper finish.

Included in Stage 4b:

  • Architectural drawings to illustrate key details where further information may be needed – eaves/ridges/abutments.
  • Where applicable: Kitchen Plan, Indicative Electrical Layout, Window and Door Schedule.

 

Previous Building Regulation Compliance Stage:

Next Interior Design Stage:

Drawing Board and Instagram Feed


Spring is finally tiptoeing in (weather permitting!), and we`re excited to share a sneak peek of our latest project.

These keen gardeners have a beautiful home adorned with stunning Hellebores. This week, we`ll be diving into creating sketch designs to fulfil their dreams of a bright home office, a functional utility/boot room, and a sleek new ground floor shower.

They`re not looking for cookie-cutter solutions – they want a space that reflects their unique personality and lifestyle. We can`t wait to explore the possibilities and bring their vision to life! ✨
...